Project Name: Construction of Agra- Gwalior Greenfield Road comprising of:
Section-1: Development of 6 Lane of access-controlled Agra-Gwalior greenfield highway, starting from design km 0+000 (near village Deori in district Agra) to design km 88+400 (near village Susera in district Gwalior) in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh and,
Section-2: Overlay/Strengthening, other road safety and improvement works on existing Agra- Gwalior section from 1058.00 to 1148.00 (Design chainage 13.00 to 103.00) of NH-44 in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh on DBFOT pattern at BOT (Toll) Mode under NH(O) scheme.
SPV Incorporated on: 30.04.2025
GRIL equity interest control in SPV: 100%
Total Length of the Project:
Section-1: 88.40 km (Construction of 6 lane access-controlled greenfield Highway),
Section-2: 90.00 km (Overlay/Strengthening, other road safety and improvement works)
Authority: National Highways Authority of India
Independent Engineer: LN Malviya Infra Project Pvt. Ltd. in Association with Pioneer Infra Consultants Pvt. Ltd.
Bid Project Cost: 4755.06 Cr.
Date of LoA: 18.03.2025
Agreement signed on: 30.04.2025
Appointed Date: 07.09.2026